Construction pipeline faces a thin order book as NAB survey sours

The construction pipeline just got a harder look from the people who build it. NAB’s October business survey recorded forward orders at -12, an 11-point drop in a single month and the weakest reading since the pandemic. Construction and manufacturing drove most of the fall.

Forward orders are a plain measure: how much work firms have lined up. When that number sinks, today’s busy sites can look fine while next year’s start dates quietly go missing. That is the gap housing supply watchers should care about.

Busy now, thinner later

Here is the catch. Of all the industries in the survey, construction is still running closest to full capacity, a result tied to residential and commercial demand. Builders are working. But capacity use describes the work in front of them, while forward orders describe what comes after. The two can diverge for months before the slowdown shows up in completions data.

That split matters for anyone reading housing supply forecasts. A strong current workload does not guarantee the pipeline behind it is healthy.

The cost squeeze behind the orders

The survey points to a margin problem. Input costs rose 2.4% over the quarter, while selling prices rose only 0.6%. Firms are absorbing most of the difference. Profitability sits 12 points below its long-run norm.

For a builder or developer, that arithmetic is hard to ignore. A project that stacked up on last year’s costs may not stack up on today’s. Some will be deferred, resized or shelved, which is exactly what a soft order book looks like from the outside.

Investment intentions fell 5 points to 2, which reinforces the point. Firms that expect thinner earnings tend to hold back on capital spending, and in construction that includes equipment, sites and new work.

Funding is the other half of the story

The survey does not measure developer finance directly, so be careful here. But the conditions it describes are the ones that make lenders cautious: weaker profitability, squeezed margins and low sentiment, which sits at -15 and in the bottom 5% of the survey’s history according to an industry economist.

The timing adds pressure. Responses were gathered between 24 and 31 October, which came after a September-quarter inflation print that was hotter than forecast and just ahead of the central bank’s 3 November hike. Separately, mortgage-holder confidence has hit its lowest level since 2008 after the cash rate reached 4.85%, though one bank thinks rates have peaked.

Key numbers

  • Forward orders: -12, down 11 points
  • Business confidence: -15, down 1 point
  • Input costs: +2.4% quarterly; selling prices: +0.6%
  • Investment intentions: 2, down 5 points

If buyers are nervous and lenders are cautious, a developer faces a double test: finding pre-sales and finding credit. Both are plausible casualties of a weak order book, though neither is confirmed by this one survey.

What the survey does not say

Treat this as a warning light rather than a verdict. Employment rebounded 5 points to 4, and labour costs rose 1.5%, so firms are not shedding staff yet. Weaker earnings could curb hiring ahead, but that is a risk, not a result. Mining remained the only sector with positive sentiment, and retail was weakest at -18 in trend conditions, so the pain is uneven rather than uniform.

The rate view also cuts both ways. If rates have peaked, as one bank suggests, financing pressure could ease from here. If they have not, a thin order book meets rising funding costs.

Why this matters for buyers and investors

Fewer starts today can mean fewer completions in a year or two. That is the supply story behind tight rental markets and firm prices in undersupplied areas. We have covered how new build investor lending is a record share of a shrinking pool, and a softer order book adds to that picture. The household side of the same squeeze shows up in mortgage arrears risk as sentiment hits a four-year low.

The practical read is simple. If you are weighing a new-build or off-the-plan purchase, ask the builder how funded and committed the project is, and check what happens to your deposit if timelines slip. If you are watching supply for investment timing, track building approvals and starts alongside surveys like this one, because forward orders are an early signal, not a final count.

If you want the weekly signal on rates, supply and policy, subscribe to the newsletter.

General info, not financial advice.

Share this article

LEAVE A REPLY

Please enter your comment!
Please enter your name here